Pyrometallurgical copper smelting; Smelting, blowing and refining; Mixed production; at plantVersion: v01.01.001Tiangong LCAReference productCathode copperFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2015Data sourceTiangong LCA Data Working GroupThe cited source study (Wang et al., 2015) quantified environmental impacts of refined copper production over raw material extraction, energy production, transport and smelting, with a functional unit of 1000 kg refined copper. This dataset retains only the exchange inventory listed here; stages the source covers but this dataset does not enumerate (upstream mining/beneficiation and transport) remain outside the modelled boundary. [Root-cause parallel repair (2026-11-18): D4:2a6c9b60->0ce3dedb]
Secondary copper production; Two-stage method - blast furnace smelting; Mixed production; In the factoryVersion: v01.01.001Tiangong LCAReference productSecondary copperFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2006Data sourceTiangong LCA Data Working GroupProduct systems related to equipment and infrastructure (including transportation vehicles, machinery, factory buildings, etc.) are not within the scope of the study.The energy sources such as electricity and steam are regarded as the energy input from the environment to the system. The environmental load brought by the generation of these energy sources depends on the amount of electricity and steam used, and is included in the environment of the process by analogy The load is on. The transportation journey is calculated based on a 3t heavy-duty truck with a capacity of 100 km. The treatment process of waste water and solid waste is not considered. Auxiliary materials with an environmental impact of less than 5% (such as quartz) are not considered.
Secondary copper production; Two-stage method - blast furnace smelting; Mixed production; In the factoryVersion: v01.01.002Tiangong LCAReference productBlister CopperFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2006Data sourceTiangong LCA Data Working GroupProduct systems related to equipment and infrastructure (including transportation vehicles, machinery, factory buildings, etc.) are not within the scope of the study.The energy sources such as electricity and steam are regarded as the energy input from the environment to the system. The environmental load brought by the generation of these energy sources depends on the amount of electricity and steam used, and is included in the environment of the process by analogy The load is on.Other versions matched in this search 1
Primary aluminum production ; Primary aluminum ingots ; Cradle; Cradle; ChinaVersion: v01.01.001Tiangong LCAReference productPrimary aluminiumFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2008Data sourceTiangong LCA Data Working GroupChina aluminum industry LCA based on the non-ferrous metals industry yearbook, literature, and research data.Other versions matched in this search 1
Copper smelting by hydrometallurgy; Processes such as mining, crushing, leaching, extraction, electrodeposition, melting of ingots and production of auxiliary materials.; Mixed production; In the factoryVersion: v01.01.001Tiangong LCAReference productCathode copperFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2006Data sourceTiangong LCA Data Working GroupThe research process does not include the stage of material usage and recycling treatment. The treatment of recycled copper is regarded as the production process of recycled copper and is not included in the evaluation system. The quantity of by-products such as lead and zinc is small (<1%); Secondary auxiliary materials such as explosives, flotation reagents, and electrolytic additives are used in small quantities and do not affect the accuracy of the evaluation results, so they are excluded from the evaluation body.
Aluminum ingot casting ; Primary aluminum ingot ; National average ; Liquid primary aluminum; Liquid primary aluminum; unspecifiedVersion: v01.01.001Tiangong LCAReference productPrimary aluminiumFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2011Data sourceTiangong LCI Data Working GroupRoot-cause parallel repair (2026-11-18): D6:greenhouse_gas->CO2_fossilOther versions matched in this search 1
Secondary copper production; Two-stage method - electrolytic refining; Mixed production; In the factoryVersion: v01.01.001Tiangong LCAReference productSecondary copperFunctional unit1000 kgGeographyChina (CN) · Geographic precision not specifiedReference year2006Data sourceTiangong LCA Data Working GroupProduct systems related to equipment and infrastructure (including transportation vehicles, machinery, factory buildings, etc.) are not within the scope of the study.The energy sources such as electricity and steam are regarded as the energy input from the environment to the system. The environmental load brought by the generation of these energy sources depends on the amount of electricity and steam used, and is included in the environment of the process by analogy The load is on. The transportation journey is calculated based on a 3t heavy-duty truck with a capacity of 100 km. The treatment process of waste water and solid waste is not considered. Auxiliary materials with an environmental impact of less than 5% (such as quartz) are not considered.